Manual for A97UH2E & 97G2UHE

Brand: Allied Air Enterprises

Category: Furnace

Manual Type:

Language:

Uploaded: April 1, 2025, 12:48 a.m.

Warranty Summary

Equipment may experience premature component failure as a result of failure to follow the installation instructions which voids the manufacturer's equipment limited warranty.

Unit Start-Up Procedure:

  • Safety First: Read safety instructions before operating.
  • Initial Checks: Smell for gas leaks. Ensure gas valve switch is OFF.
  • Power Off: Turn off electrical power to the unit.
  • Wait: Allow five minutes for gas to clear if smelled.
  • Gas Valve ON: Move gas valve switch to ON.
  • Power On: Turn on electrical power.
  • Thermostat Setting: Set thermostat to desired temperature.
  • Purge Air: Initial start may require repeating steps to purge air from gas line.
  • Troubleshooting: If unit fails, follow 'Turning Off Gas to Unit' instructions and call a technician.

Troubleshooting and error codes

None

Troubleshooting and error codes

None